Before anyone commits to a claim
An event has occurred. The question is whether it moved completion, by how much, and whether the record can prove it — answered before the client spends money on a claim that will not survive scrutiny.
Independent practice · Cairo
I establish who caused construction delay and how much time it actually consumed — as an engineer-lawyer who has spent nineteen years building the very programmes that disputes are argued over.
Typical instructions
An event has occurred. The question is whether it moved completion, by how much, and whether the record can prove it — answered before the client spends money on a claim that will not survive scrutiny.
An extension-of-time submission has arrived. It needs testing against the programme record, its causal chain checked, and a reasoned response prepared that separates entitlement from mere delay.
A report is being used to settle or argue the matter. Its method, its record base and its conclusions need independent review — and the review needs to be defensible in its own right.
The schedule evidence must be presented clearly, consistently with the reports already served, and inside the tribunal's timetable — including the demonstratives that make a programme legible to non-engineers.
Method
Which analysis is available depends on the record: whether the programme was updated contemporaneously, whether the baseline was accepted, whether the events can be isolated. That choice is made explicitly, in writing, before any time is quantified.
How I work
One matter, one lane. The wall does not move.
Never both. In a single dispute I act either as advocate or as expert and analyst — not both, not sequentially, not “for a limited purpose”. Independence is the product; an opinion with a stake in the outcome is worth nothing to the tribunal that has to weigh it.
No prior role, and full disclosure. An expert or analyst instruction is accepted only where I hold no advisory, advocacy or commercial role for any party, contractor or adviser connected to that dispute — and prior involvement is disclosed before appointment, not after.
Where a client needs both, the advocacy file goes to counsel and I remain on the technical side of the wall. Firms tend to find that arrangement useful rather than inconvenient: the analysis stays clean, and the advocacy is done by someone whose independence was never in question.
Why it is non-negotiable. The expert franchise is the scarcer asset, and one sustained challenge to independence ends it permanently. Advocacy can be referred on. An appointments record cannot be rebuilt.
The record
Sector experience
Doha Port, Qatar · Tahya Masr Multipurpose Terminal, Alexandria, Berths 55–62 · Alexandria Chemical Terminal.
Terminal Building 3, Cairo International Airport · Borg El Arab International Airport modernisation.
Katara Hills, Qatar · Cairo Festival City · Mall of Arabia · MADINATI Open Air Mall · Semiramis InterContinental · Le Méridien Pyramids · Dar Al-Fouad Hospital · Porto October.
Wahat–Frafrah 45 km, Abbasah–Zagazig 19 km and Al Hasana–Nakhil 40 km for the General Authority for Roads and Bridges, with associated roadway bridges.
Abu Sultan Medical Union pharmaceutical plant · Jotun paint plant extension, Ismailia.
Surface stations for the Greater Cairo underground network, with associated flyovers and bridges.
Contact
Enquiries from law firms, contractors, consultants and employers are welcome. A first conversation usually establishes within twenty minutes whether the record supports an analysis — and if it does not, that answer costs nothing and saves a claim.